• Confound4082@lemmy.ml
    link
    fedilink
    arrow-up
    6
    ·
    9 months ago

    Power company asked if I wanted a three phase meter when I was checking power requirements for wiring my shop up.

    I just needed a different meter.

    • blujan@sopuli.xyz
      link
      fedilink
      arrow-up
      3
      ·
      9 months ago

      Usually it’s the meter and the cabling that needs changing, like an extra phase needs to be introduced but it should be available at street level if any commercial place is around.

      Your shop might have had the cables already and just needed the meter change.