I have some decent ideas as to why, I’m asking mainly as a hopefully fun contribution here, and to maybe learn some interesting plumbing info!
I have some decent ideas as to why, I’m asking mainly as a hopefully fun contribution here, and to maybe learn some interesting plumbing info!
Labor is the most expensive part: isn’t that just doubling the labor cost? Or is it that when a house is converted, they just thread through the existing leaky plumbing?
Labor where I live is not expensive.
To clarify, it’s done for clean water only.
They install a 4 inch pvc pipe and thread a 1/2 inch hose inside. So when the hose breaks, the water wouldn’t damage the building. Itll just leak inside the pvc pipe.
The one ive seen was done while being built.
TIL …