First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

  • oyo@lemm.ee
    link
    fedilink
    English
    arrow-up
    0
    ·
    1 year ago

    oyo

    You can build entirely new solar supply chains from mining through manufacturing faster than a single new nuclear plant.

    • timkmz@lemy.lol
      link
      fedilink
      English
      arrow-up
      0
      ·
      1 year ago

      But solar panels take up a lot more space for the energy they give out than a nuclear plant iirc

      • dlanm2u@sopuli.xyz
        link
        fedilink
        English
        arrow-up
        1
        ·
        1 year ago

        i mean if you mix them all together and use land area for geothermal and solar or nuclear and solar you kinda fix the issue because solar’s issue is it takes up space but it can go in the same place as another thing like wind or nuclear or geothermal or hydro but it doesn’t work the other way too well, you can’t have wind efficiently at a nuclear place all the time, nor can you do geothermal at every nuclear plant or hydro

        so tl;dr solar is useful for combined energy sources on already used land areas but otherwise its kinda dumb as a primary energy source so is wind on land for other reasons but if you combined wave or other hydro, wind, and solar all together it’d be great though idk how good that’d be for the ocean cuz you’re occluding sunlight

        its a whole intricate balance tbh