Are the predicted prices ever crazy far off from what they actually end up being like what happened in Texas last winter? Where am outage causes price to go from like 20c/khw to 2000c/khw over a one hour period?
Are the predicted prices ever crazy far off from what they actually end up being like what happened in Texas last winter? Where am outage causes price to go from like 20c/khw to 2000c/khw over a one hour period?
How do you keep up with the current price? Does your thermostat have a setting where if the price is above X then turn off? Do you just come home to a freezing house and say “oh the electric is too expensive, guess I’ll grab some wood”?
That is already a thing and it’s called concentrated solar power. Basically aim a shit load of mirrors at a target to heat it, run some working fluid through the target and use that to make steam to turn a turbine. There are a few power plants that use it but in general it has been more finicky and disruptive to the local environment than traditional PV panels would be.
Yep, the standards for energy efficiency in homes is just barely above being non-existent. We spent decades with cheap energy so no one cared if every house leaked like a sieve. Now that’s coming back to bite us.
I have an air source heat pump for my house and a heat pump water heater. Even in the dead of winter at 0F it kept my house just as warm as always and my water was hot. Heat pumps are not “shitty alternatives” any longer. Maybe in Alaska they would struggle but anywhere else and they work just fine.
If we want to honestly improve the climate then it is REQUIRED that we become carbon negative, not just net zero. And every little bit of emission that is prevented is a lot of power that isn’t needed later on to suck that carbon back out of the air.
You can complain that big companies aren’t doing enough to cut emissions and I agree, but that doesn’t mean we should wait till they clean up their act to start working on ours.
In addition to what has been said already, in many places the cost to upgrade the electrical service to the building to handle the amount of power that could be generated can be as much or more than all the other costs combined. So now the building operators are looking at millions in cost with a potentially 30 year payback period. It just doesn’t make sense at that point.